Passion XI

Didi 120

The sugar scoop stern ready for fibreglass, paint and a name

The sugar scoop stern ready for fibreglass, paint and a name

2016-07-22 13.09.32

Glass reinforcement under the winch bases. One is finished the other still has a few layers to go

Glass reinforcement under the winch bases. One is finished the other still has a few layers to go

Like the cattle herd that stampedes towards the water hole I can smell the water and am pushing hard to get the yacht completed. I wanted to see what the stern would look like once finished so I pushed hard to get a photo opportunity late today. Ron gave me a hand on Friday to glue the panels he had cut into place. I had planned to leave the glue to cure for a couple of days but Friday was so warm and warm so late in the night that the glue was rock solid by Saturday morning. That gave me the chance to glue on the capping pieces and let them cure over Saturday night. By late afternoon the glue was cured enough for me to trim the excess and take the photo as the sun was going down. The reinforcement for the winch based under the cockpit coamings is also completed so tomorrow after a final sand I will coat the insides with epoxy primer. On the exterior the woodworking jobs to go are the mast step base, two cabin hatch surrounds and the detail around the companionway, the locker lid and the gas bottle compartment lid. These are not too complicated so we shall see how we progress this week. There are still toe rails to do so perhaps I should make up my mind what timber to us and order it. I have started to buy fittings so that we can drill the holes and locate the areas that need reinforcement. I want to add any under deck reinforcement before I paint the underside of the deck.

The coamings now have the four fibreglass winch bases cut in and bogged in place ready for the final glass reinforcement. The first job today was to trim the excess glass from the last two winch bases and vacuum up the fibreglass dust. I took the port coamings to the garage to cut the holes for the winch bases. Before fitting the bases I trimmed the excess plywood from the joins and vacuumed up the wood dust. Because I could turn the coamings around I found it easier to power plane the excess plywood in the garage than it would have been if they had been glued to the deck. Once the port coamings were ready to fit the winch bases I retrieved the starboard coamings from the hull and finished the fairing on those. I reused the temporary supports from under the starboard coamings on the port side and there is a photo to show how they fit. Several vacuum cleans of the garage later the winch bases were ready to bog in place. Even with winter hardener the epoxy filleting around the bases was going to take all afternoon to cure and I had other jobs to do. I have been putting off finishing the sugar scoop stern because it is a fiddly job and there is not much progress to show. However with mates coming tomorrow to help fit the inside liners there was a deadline to meet to glue all the pieces into place. The task was neither as difficult or as time consuming as I had anticipated and in a short afternoon they are all glued in place. I have used the final capping plywood as a gluing guide for the infill pieces. By temporarily screwing the capping plywood in place and by protecting it with kitchen paper I was able to clamp each of the pieces to the plywood capping piece. Tomorrow when the glue has cured it should be a quick tidy up before fitting the inside liner of the sugar scoop stern. As a bonus the capping pieces are ready to go and the wood dust is vacuumed up too.

The underside of the starboard coamings showing the temporary supports which held the winch bases in place while the bog cured. The  temporary supports were reused on the port side.

The underside of the starboard coamings showing the temporary supports which held the winch bases in place while the bog cured. The temporary supports were reused on the port side.

Four winch based for our Didi 40 Cr. the coamings have been trimmed in the garage.

Four winch based for our Didi 40 Cr. The coamings have been trimmed in the garage.

Passion and Izzi on the first run

Passion and Izzi on the first run

Another view of Passion on the wet Wednesday race at RANSA

Another view of Passion on the wet Wednesday race at RANSA

Daybreak on Wednesday was a miserable wet one. Rain was blowing in under the awning so it was best to leave the tarpaulins on the Didi 40 CR and do some shopping pre the Winter Wednesday race at RANSA. In the miserable conditions I can understand crews opting for the comfort of a fireplace and a good book but nine hardy regular crews took to the water in Division 1.

The leg out to South Head was a tricky run sometimes square and sometimes on the beam. I chased the wind directions around the course trying to keep the poled out genoa setting. One of our crew had the day off and took some photos of us battling it out with club mate Izzi on the run. Our tactics must have worked because we arrived at the mark mid fleet and looking good on handicap. On the work back to Rose Bay I could not find the groove with the No 1 headsail. The entry was too flat for the telltales to stream on both sides of the sail so I asked Kevin to helm while I fiddled with settings. A bit more luff tension and moving the genoa cars forward a notch helped to get Passion moving. At the bow looking up at the flow in the big black No 1 heavy genoa it is obvious that the sail needs some forestay sag to get the shape in the luff. The main however needs some mast bend to free the leech so the combination works better with a bit of breeze. Now that we had settled into a groove we were holding Aggrovation and Izzi to windward. We swapped tacks a couple of times with Aggrovation and managed to be above them on starboard approaching what was to be the last turning mark on a shortened course. The last run to the finish was a poled out affair and we were lucky to get a clear run to the finish while Aggrovation was blanketed from behind. That let Izzi charge through to the finish. It was good to be so close to our club mates and even better to just pip them at the finish. With our more benevolent handicap we won the day and increased our lead on the progressive pointscore. This was our reward for braving the rain.

After a pleasant break visiting family on the north coast it was back to the cockpit coamings on Saturday and Monday. On Saturday I finished the third coat of varnish on the bunk tops and they are stored away for now.

In the coamings there are pockets for storage and also for access to the underside of the winch pads. I marked and cut these and then glued up the starboard coamings. Time was getting away so Elaine held the work light up for me as I finished gluing and screwing the panels together. Sunday is a church day but our prayers for wind for the afternoon winter race were unanswered. It was however a nice warm sunny day and the complimentary BBQ back on the deck at Greenwich Flying Squadron made it one of the best afternoon of the winter.
Today I laminated up the first winch base in a bucket and while it was curing removed the starboard coamings from the deck. To my relief they came away easily and the underside is very tidy and ready for glassing. Next task was to glue up the port side coamings making sure that there was enough kitchen paper under the cleats so that any surplus glue did not stick it to the deck. By this time the first winch base had cured in the warm sunny position I had placed it so I could remove it from the mould and start the second one. I had visions of doing a third winch base in a second mould but time, light and energy deserted me so best to leave it for the morning. With luck I can do the two in the morning and still have them cured by the afternoon. The plan is to cut out an oval section of the plywood on the coamings and insert the winch bases into the hole and laminate the base to the coaming from below. Eight layers of 450 gram glass will give 4 mm of cured laminate equivalent in strength to 12 mm plywood. By the time the base is glassed in it will have 16 layers around join. The winch base will have a 12 mm plywood backing piece bogged in and glassed over. Hopefully the forecast rain will not stop any of this activity. The location of the winches proved a bit of a mystery. Dudley had three versions of the deck for the Didi 38, the extended Didi 40 with the long racing cockpit and the Didi 40 Cr with the shorter cockpit and longer cabin. Each version has a different winch base position. Our version has slightly shorter coamings because they finish where the cockpit widens out. By luck or good design our winches seem happiest located right in the middle of the coaming pockets. At 700 mm from the cabin and 700 mm spacing we have excellent access to the bolts under the bases and it looks very symmetrical. Our rear winches will double as running back stay and occasional spinnaker sheet winches so being located a bit further aft is appropriate. It is very much in the fashion of the more modern cruisers where one winch is in easy reach of the helm position. With our wide cockpit the coamings are 125 mm further outboard and they line up very well with the genoa cars so I might see how we go without cheek blocks on the coamings.

Elaine inspecting the anchor locker hatch last week

Elaine inspecting the anchor locker hatch last week

Starboard cockpit coaming half way through being removed from the deck for fitting the winch pad.

Starboard cockpit coaming half way through being removed from the deck for fitting the winch pad.

The underside of the coaming ready for glassing of joins

The underside of the coaming ready for glassing of joins

Winch pad mouldings. One made, one curing and the mould for a third ready for the morning

Winch pad mouldings. One made, one curing and the mould for a third ready for the morning

Trial fit of the first winch pad. It will be 30 mm lower when recessed into a hole in the plywood.

Trial fit of the first winch pad. It will be 30 mm lower when recessed into a hole in the plywood.

Port side prepped with kitchen paper and ready to apply the glue to the cleats and plywood.

Port side prepped with kitchen paper and ready to apply the glue to the cleats and plywood.

It was not quite a rerun of last week as the breeze was a couple of knots stronger and the chill factor a few degrees worse. As the breeze gusted up the lane Cover River straight into the doors of the club I was anxious about taking the tender out to Passion on the mooring. The crew from Aggrovation arrived having decided that Aggrovation was too exposed to the wind to board. They kept a watch on me as I rowed out to Passion and all was well close into the Greenwich hill.
On the water we did tack the No 3 genoa down to the deck and we did start with a reef in the main. On the run down the genoa was often blanketed by the main and often it was too tight to have the genoa poled out. Eventually we worked to windward enough to set the pole and from then kept in contact with the fleet. We did hit 8.9 knots in one spell which is a recent record and probably more reliable than just the speed through the water reading.
Immediately we turned the mark for the beat home we put in the second reef. I could see from the speed over the ground that we were going faster than last week with the two reefs in so I will concede that we would have been faster last week with one reef in. All around us our competitors with single reefs were having trouble while Izzi with a double reef was doing similarly well to ourselves.
Upwind the boat speed was at least a knot faster than last week. With the smaller main I could maintain shape in the genoa. L’Eau Co was alongside us again and this time we pulled away on the work for all of the race and not just the last dash to the finish. Izzi had run to the top mark faster but we were pulling her back ever so slowly on the beat home.
Around Shark Island we hit 8.3 knots with the double reefed main and I did promise the crew we would go at least three knots faster in the new Passion X in those conditions. I know the prototype did hit 17 knots with poled out genoa down a wave so I think I am on safe grounds with the speed promise.
Passion did hit 7 knots to windward at height similar to the other cruiser racers in the fleet and I confess I am less confident about the upwind speed of Passion X. We will have 13% more righting moment on a boat that is 25% lighter and 10% longer so I will be disappointed if we cannot be half a knot faster to windward.
On the work to the finish we passed Larrikin and drew further away from L’Eau Co but did not quite catch Izzi. Amante and The Biz took the major places while we scored a very safe third. If we can sail as well every windy day I will be very pleased.
We increased our lead in the series by a couple of points but a few behind us have 25 point races to drop which will bring them closer.

A bonus photo of progress on Passion X is included. It was so windy I had to take down the tarpaulin covering the stern and so could get a better picture of the coaming around the cockpit.

Worried about rowing out to Passion with all the white caps on the water

Worried about rowing out to Passion with all the white caps on the water

 

Progress on the coamings on our Didi 40 Cr Wide Stern version

Progress on the coamings on our Didi 40 Cr Wide Stern version

Now that most of the deck is protected from the wet by the epoxy glass coating I have started on the cockpit coamings. Coamings are a raised border around the cockpit to keep out the water. They also act as a back rest when sitting in the cockpit and sometimes can act as a seat when sitting outboard when the boat is heeled. It has taken two days to cut all the odd shaped longitudinal stringers and cleats as well as the odd shaped panels of plywood that form the coamings. They are all screwed into place temporarily. I propose to glue all the parts together but not to the deck so that I can remove the formed up coamings and turn them upside down to glass inside. That way I can incorporate the winch mounts as hollow structures glassed into the coamings as you would expect to find on a production yacht. i have a couple of plastic buckets ready to laminate up the winch bases and I might cut up one bucket and put it on the coamings just to see if it looks right.

First look at the cockpit coamings on our Wide Stern version of the Didi 40 cr

First look at the cockpit coamings on our Wide Stern version of the Didi 40 cr

View down the starboard coaming on our Didi 40 Cr. The seat on the deck behind the coaming feels like a good helming position

View down the starboard coaming on our Didi 40 Cr. The seat on the deck behind the coaming feels like a good helming position

We had just enough fine weather and just enough fibreglass cloth to complete most of the glassing of the deck of our Didi 40 Cr before the rain really set in. Thursday and Friday have been awful boat building days but with Kevin’s help we fitted the two chainplates on the side decks and the two plates for the running backstays. Late on Thursday I spent two hours hand sanding the roof beams in the cabin. Today was even more inclement and a meeting of the Sydney Harbour Users Group was a welcome break from the dust. This afternoon I donned sanding gear and spent half a day machine and hand sanding the roof in the V berth.
While I dislike the wet and cold there is much to do inside and once kitted up for the sanding it was quite comfortable lying in the V berth and looking up at the ceiling. A 100 mm foam mattress would have made it so much more comfortable.
Not wanting to leave too many tasks to the last minute I have lashed out and put a deposit on a new fat head mainsail. I had thought to get on the water with a modified pin head main off Passion and see how it went but as time has marched on all the trialing time has gone and we will need the new main at launch. In building the new yacht I made was determined not to go too high tech or add more expensive equipment than you would find on the average stock production yacht. What we have on Passion is the benchmark for what we will have on Passion X. That means the mainsail will be a radial cut from woven cloth. I am very keen on carbon for the genoas as the low stretch keeps the flow in the right position. With the mainsail supported on the mast I am less concerned for stretch and more concerned for reliability. I have gone for the Hydra Net Radial cloth as the lightest woven that will be suitable for the very low displacement of the Didi 40 Cr. I hope it is the right decision.
I have also put down a small deposit on the rig so that they can proceed with production drawings ahead of the full deposit that needs to be paid eight weeks before launch.
Inside we can measure up all the cushions and get these under way.
As a reminder of what the rig should look like I have included a sketch.

The very slightly larger rig on our Wide Stern Deep Keel version of the Didi 40 Cr

The very slightly larger rig on our Wide Stern Deep Keel version of the Didi 40 Cr

On Wednesday we enjoyed a fresh and gusty breeze with regular readings on the mast head of over 20 knots. In the conditions we set the No 3 genoa which is a 105% sail and the full main. Our competitors set a wide range of sail combinations. Allegro had the same arrangement as we did, Rainbow had a larger genoa and a reefed main while L’eau Co had a small no 4 and a full main. Only ten starters braved the weather so you could say the rest set no sail and pre start even under bare poles we had quite a lean in the gusts.
We were blown out to South Head at a fast clip with most yachts up to hull speed so the fleet was closely bunched at the turn mark. We were last around the mark but that is to be expected as the larger yachts had higher hull speeds and all the small ones stayed home for the day. Upwind we were managing but not very comfortably. The contrast in the Northshore 38’s was interesting as Izzi was handling a larger genoa well while Rainbow was being blown over even with the reefed main.
At the Rose Bay turn mark we tacked away while those yachts that carried on into the bay were rewarded with a very nice lift on the way out. We were not very happy to miss the shift and there was no way to carry on waiting for the wind to shift back so we took a losing tack back into the bay. We were still last on the run and reach around Shark Island and lamenting our position. There seemed no hope of redemption on the work back to the finish off Rushcutters Bay but the breeze lightened a little and we could crank the mainsheet in for more height and still maintain good speed. We timed the last tack back to the finish to perfection and were able to lift up from below L’eau Co and just beat them over the line. Looking around it seemed we had made up time on the fleet so when the results came out I was pleased but not surprised that we scored 6th place on handicap. On the progressive point score we maintained our first place with a lead of nine points and did no damage to our handicap.
The question is how could we have done better? We were not overpowered by much and we could have tacked the No 3 down to the deck. This would have improved the end plate effect and opened the slot between the genoa and main. As an alternative we could have reefed the main at the top mark and possibly taken the reef out for the trip around the island. I like to keep the full mainsail up for the times the genoa is in the wind shadow of the main so next time I will try the genoa hard down on the deck.

 

 

At last I am happy with the fairing of the gunwales and have moved on to glassing the deck. I am about a third of the way through and need at least three fine days to finish the deck. In the photo you can see where the layers of glass join and overlap. I am using two layers of a light glass cloth hoping to get a smoother finish than we did on the hull where I used a heavy double bias cloth. The glass cloth was first purchased about 25 years ago when I was building vacuum bagged foam fibreglass NA14’s. I am going to run out before the job is finished so do I buy just enough or get another roll for 25 years supply? On the wet days I have finished the first sanding of the ceiling, epoxy coated the laminated roof beams in the cabin and started sanding the epoxy ready for the first coat of paint on the ceiling. The crew helped fit the Vetus exhaust hose and that took very little time as it went to plan and followed all the planned curves. We also progressed the bits and pieces of timber needed to complete the transom sugar scoop stern. About 24 individually shaped timber pieces are needed and each has to be glued in place in order. It is like having a kit delivered ready to go on the first suitable occasion.

One third of the way through glassing the deck of our Didi 40 Cr

One third of the way through glassing the deck of our Didi 40 Cr

Wednesday was one of those days when you felt sure that the race would be abandoned and many of the fleet probably wish it was. The race officers in their wisdom shortened the course at the top mark for the Divison 2 fleet which meant we in Div 1 had a short leg back from the heads to the finish.
We started in more breeze than forecast and finished in almost unmeasurable wind. From the start we had Aggrovation below and the rest of the fleet above but arriving on the line with speed and with little to spare. For a while the good start kept us up with the fleet and looking good on handicap until the wind faded. Aggrovation had climbed above us and was well ahead but now becalmed. Larrikin took the shore route out of the tide and sailed away underneath. Eventually we adopted the light air tactic of avoiding the middle and headed for the shore where a little local gradient was at play and the tide was less. As we rock hopped along the shore we passed one yacht after the other until we arrived at the mark in no breeze. We had to run away from the mark to build speed to get steerage and while it felt painful to us it was diabolical for others including Trim and Viva. Aggrovation gave up her lead on us doing the same tactic of running away from the mark to get steerage only they were out in more tide and it took longer. The tracks from the chart plotter were not as diabolical as expected against the incoming tide and with just 2 knots of breeze.
After rounding the mark I was surprised to see Allegro and Fidelis not far ahead so if we could make the shortened course finish line before the cut off we would be in a good position.
Fortune smiled on us again with a late zephyr of three knots bringing us home on a beam reach ahead of all the Northshore 38 and other fancied competitors. A third place was a very good result on the day and it increased our lead on the progressive points.

For the second week we found a fellow competitor to assist with a tow back to the club and this was a long tow almost from the Heads to Rushcutters Bay. At seven knots the little Britannia was almost up on the plane.

It was a long slow day and a big thank you to the crew.

Tracks rock hopping against the tide in 2 knots of breeze.

Tracks rock hopping against the tide in 2 knots of breeze.

Sanding and filling holes in the deck ready for glassing is painfully slow. The orbital sander with the vacuum cleaner attached has sped up the flat surface sanding but I still had all the holes to fill and all the gunwales to fair by hand. Friend Kevin gave the sander and vacuum cleaner a work out on the deck on Thursday while I fitted the four layers of 3 mm ply doubler under the deck at the stem. Friday was a mixed bag including finishing off the last 125 mm of capping on the gunwales, sanding some of the ceiling in the cabin and fitting hinges to the V bunk tops in the evening. Most of Saturday was spent filling screw holes out in the cold wind. Each hole was primed with neat epoxy to fill the exposed wood and while the epoxy was still tacky filled with a thickened epoxy mix. Today I warmed up planing and torture boarding the gunwales. On Thursday we had taken a cut down the edges of the gunwales with the power planer and today I used a medium length plane to round off the edge and finished up with a very fine setting on a 50 year old hand plane. I have had this plane since I was a teenager and used it to trim the edges of 1/16 inch Queensland cedar veneer we used to use for building cold moulded Moth Class yachts. it is one of my favourite wood working tools as it is simple and very light so you can wield it all day.
The final task was to torture board the edges with a metre long board and 60 grit paper which was pretty good exercise on a cold day.
I now need some fine weather now for the deck glassing.

Friend Kevin helping with the sanding. Photo taken from a ladder in the neighbour's yard.

Friend Kevin helping with the sanding. Photo taken from a ladder in the neighbour’s yard.

My favourite little hand plane had a four hour workout today

My favourite little hand plane had a four hour workout today

Elaine approving the hand planing job. The glue lines in the plywood are a useful planing guide

Elaine approving the hand planing job. The glue lines in the plywood are a useful planing guide

We seem to be performing better since we put Passion on a diet. I estimate we have removed 300 kilo of ballast and surplus equipment. We have compensated by being a bit more conservative with the sail area and that paid off well today.With the No 2 genoa with a LP of 135% we held our own on the reach to the heads and sailed well on the work back to Rose Bay. It helped that we made a good start on the boat end and kept low out of the wind shadow of Bradleys and it helped when on the beat to windward Malcolm pulled the adjustable back stay tighter than ever. The reward for all this was a second place today to the heavy air specialist Viva. Our all winds performance has however rewarded us with a first place on progressive points.
While the points are nice due to our handicap what was nicer was the fastest time position ahead of all the Northshore 38 and Aggrovation. We did chase Izzi all the way around the course and were rewarded on the last throw of the dice when we took their transom and held on to the middle of the harbour and came back on a lift. It was our one bit of luck for the day and a bit of icing on the cake.

Now that the capping pieces on the gunwhale of our Didi 40 Cr are planed and sanded in line with the deck and hull the sweet shape of the yacht is clear.

Now that the capping pieces on the gunwhale of our Didi 40 Cr are planed and sanded in line with the deck and hull the sweet shape of the yacht is clear.

Once I started sanding the deck I could not stop till the front half was finished.  I needed to add the rope as a hand hold to stop me sliding off the sanded deck.

Once I started sanding the deck I could not stop till the front half was finished. I needed to add the rope as a hand hold to stop me sliding off the sanded deck.

24 mm plywood mast knee. The deck in this area is reinforced with two layers of 6 mm ply so the total is four layers of 6 mm ply from side to  side. The hand hold will be practical as well as lightening the appearance of the knee.

24 mm plywood mast knee. The deck in this area is reinforced with two layers of 6 mm ply so the total is four layers of 6 mm ply from side to side. The hand hold will be practical as well as lightening the appearance of the knee.

The little infill panel at the front of the V berth shaped so that the bunk tops do not hit the frames when the tops are folded back. Lots of storage under the bunks.

The little infill panel at the front of the V berth shaped so that the bunk tops do not hit the frames when the tops are folded back. Lots of storage under the bunks.

There are so many interesting jobs to do on the boat that I feel spoilt for choices. I know there is a critical path which will get the boat finished in the shortest time but I think it is my boat and if I want to do this particular job now I can. So a few little jobs have been finished and some large ones done. The capping on the gunwhale is glued in place and planed and sanded down to the line of the deck and hull. The two edges will be faired with the torture board before final rounding and glassing. A couple of the small jobs I wanted to do were the knee at the mast step in which in incorporated a hand hold and the front of the V berth bunks where a small in fill piece was needed so that the bunk lids would not foul the frames when lifted. One job that I have been putting off is the sanding of the ceiling as the overhead sanding is dusty. I solved that problem by connecting the vacuum cleaner to the sander and not only is it almost dust free but the suction pulls the sander down to the surface making the job quite easy. I got quite excited with this development and sanded half of the deck, some of the hull and some of the cabin sides in an afternoon. The sanding was possible despite the strong winds as the vacuum took all the dust away.
Other interesting jobs awaiting are fitting the control cables to the engine and fitting the water lock muffler and exhaust pipe but if the weather is fine I must push on with the deck glassing and painting so that we can start putting fittings on the deck while I finish the coamings on the cockpit. So many interesting choices.

Completed foredeck on our Didi 40 Cr

Completed foredeck on our Didi 40 Cr

Once the glue was cured the anchor locker hatch could be cut.

Once the glue was cured the anchor locker hatch could be cut.

Playing with the engine controls on our Didi 40 Cr

Playing with the engine controls on our Didi 40 Cr

It is pouring rain today so much that I cannot recall the inside of Passion being so wet in ten years of sailing. We did get a race in if a shortened course slow 5 nautical miles constitutes a race. We did get to set the spinnaker and gybe it a couple of times so it is all good practice. The rain soaked spinnaker down below did contribute somewhat to the water inside Passion and now the spinnaker is drying out in our sun room at home.
Before the rain returned I made some progress on Passion X. Since the last post the foredeck is completed and the anchor locker hatch cut from the completed deck. There are four layers of 3 mm ply right at the bow and back further where the curve of the deck is not so great there is 2 layers of 3 mm and a finishing layer of 6 mm ply. Once the deck was completed I was able to complete the 12 mm ply capping pieces from stern to stem. Yesterday was supposed to be wet and it started out that way but when the rain stopped mid morning I started fairing the excess from the capping pieces. There was close to 50 metres of ply edges to be planed flush with the hull and deck and by dark last night i was almost there.
On Friday with help from Kevin we fitted the engine control lever to the hull and measured the length of control cables needed. We also cut out the ply in the location of the engine start buttons and tacko so I can go ahead and make a recess for the panel.
If the weather system moves though I will be able to get back to the deck tomorrow otherwise I will be busy sanding the cabin roof underside.

Most of the capping pieces on the port side of our Didi 40 Cr are fitted. The starboard ones are cut and pre- drilled.

Most of the capping pieces on the port side of our Didi 40 Cr are fitted. The starboard ones are cut and pre- drilled.

The stem head fitting  for the forestay is fitted so now I can complete the deck.

The stem head fitting for the forestay is fitted so now I can complete the deck.

The stem head fitting from the anchor locker side showing the laminated beams front and back of the anchor locker hatch.

The stem head fitting from the anchor locker side showing the laminated beams front and back of the anchor locker hatch.

A sunny weekend means good boat building weather. While I am reluctant to make too much noise on the weekend I cut out the plywood capping strips that cover the gunwhale and the hull to deck join. I managed to glue on the capping pieces for one side and each join was scarfed for maximum strength. The strips for the starboard side are cut, schafed and pre drilled ready for fitting after I do the final noisy trim of the gunwhale.
A less noisy job was fitting the forestay chainplate prior to installing the deck around the anchor locker. The gunwhales and laminated beams around the anchor locker had to be faired to get the final position of the forestay fitting. used a square to line up the drill bit perpendicular to the stem and eyed the mast post to get the side ways alignment. Once the first hole was true I used the stem fitting to get the hole spacing on the inside and drilled the remaining hole half from the stem and half from the anchor locker. I consider fitting the forestay chainplate a significant milestone so am pleased with the weekend progress.