{"id":1184,"date":"2016-01-26T09:29:04","date_gmt":"2016-01-26T09:29:04","guid":{"rendered":"http:\/\/3gwiz.com.au\/passion_wp\/?p=1184"},"modified":"2016-01-26T09:29:17","modified_gmt":"2016-01-26T09:29:17","slug":"australia-day","status":"publish","type":"post","link":"http:\/\/www.gwiz.au\/passion_wp\/?p=1184","title":{"rendered":"Australia Day"},"content":{"rendered":"<p>What a difference a day makes. Contrary to forecast the day was perfect for boat building and gluing in particular. I was still thinking of my friend Bruce who was retrieved intact from the briney last weekend and the importance of a good boarding ladder so I added a second 12 mm ply reinforcing panel to give a total of 36 mm of plywood to screw into. Gluing conditions were so good that I was able to add this extra reinforcement and still install the boarding platform and have the glue cured before dark. With the afternoon sun streaming into the garage I was forced to share the pleasant working conditions with a lizard which would scurry away every time I returned. In the company of the lizard I managed to cut out panels of 12 mm ply which were then glued together to make 24 mm frames for the cradle i will need when the hull is turned.<br \/>\nAll of the interior painting I propose to do before turning the hull is complete and I can now install the bracing across the hull to add strength for the turning process. There is still half a day of painting to do in the huge aft locker and other Jobs I can do while waiting for timber and a good weather forecast.<\/p>\n<div id=\"attachment_1190\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.40.03.jpg\"><img aria-describedby=\"caption-attachment-1190\" loading=\"lazy\" class=\"size-medium wp-image-1190\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.40.03-300x169.jpg\" alt=\"Perfect, even idyllic conditions for boat building on Australia Day 2016\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.40.03-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.40.03-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1190\" class=\"wp-caption-text\">Perfect, even idyllic conditions for boat building on Australia Day 2016<\/p><\/div>\n<div id=\"attachment_1191\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.20.46.jpg\"><img aria-describedby=\"caption-attachment-1191\" loading=\"lazy\" class=\"size-medium wp-image-1191\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.20.46-300x169.jpg\" alt=\"The boarding platform includes a 36 mm thick section for fastening the boarding ladder\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.20.46-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.20.46-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1191\" class=\"wp-caption-text\">The boarding platform includes a 36 mm thick section for fastening the boarding ladder<\/p><\/div>\n<div id=\"attachment_1192\" style=\"width: 179px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.30.39.jpg\"><img aria-describedby=\"caption-attachment-1192\" loading=\"lazy\" class=\"size-medium wp-image-1192\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.30.39-169x300.jpg\" alt=\"The last of the feature panels has three coats of clear epoxy.\" width=\"169\" height=\"300\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.30.39-169x300.jpg 169w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.30.39-579x1024.jpg 579w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.30.39.jpg 1520w\" sizes=\"(max-width: 169px) 100vw, 169px\" \/><\/a><p id=\"caption-attachment-1192\" class=\"wp-caption-text\">The last of the feature panels has three coats of clear epoxy.<\/p><\/div>\n<div id=\"attachment_1193\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.42.57.jpg\"><img aria-describedby=\"caption-attachment-1193\" loading=\"lazy\" class=\"size-medium wp-image-1193\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.42.57-300x169.jpg\" alt=\"The 24 mm thick plywood frames that will be part of the cradle for our Didi 40 Cr\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.42.57-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.42.57-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1193\" class=\"wp-caption-text\">The 24 mm thick plywood frames that will be part of the cradle for our Didi 40 Cr<\/p><\/div>\n<div id=\"attachment_1194\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.33.24.jpg\"><img aria-describedby=\"caption-attachment-1194\" loading=\"lazy\" class=\"size-medium wp-image-1194\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.33.24-300x169.jpg\" alt=\"Some of the lifting gear waiting to be put into action.\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.33.24-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.33.24-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1194\" class=\"wp-caption-text\">Some of the lifting gear waiting to be put into action.<\/p><\/div>\n<div id=\"attachment_1195\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.35.28.jpg\"><img aria-describedby=\"caption-attachment-1195\" loading=\"lazy\" class=\"size-medium wp-image-1195\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.35.28-300x169.jpg\" alt=\"Three extra circuit breakers added to our 12 volt distribution panel.\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.35.28-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.35.28-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1195\" class=\"wp-caption-text\">Three extra circuit breakers added to our 12 volt distribution panel.<\/p><\/div>\n<div id=\"attachment_1196\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.34.26.jpg\"><img aria-describedby=\"caption-attachment-1196\" loading=\"lazy\" class=\"size-medium wp-image-1196\" src=\"http:\/\/3gwiz.com.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.34.26-300x169.jpg\" alt=\"The tank selection valves to switch between the two 300 liter water tanks.\" width=\"300\" height=\"169\" srcset=\"http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.34.26-300x169.jpg 300w, http:\/\/www.gwiz.au\/passion_wp\/wp-content\/uploads\/2016\/01\/2016-01-26-18.34.26-1024x579.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-1196\" class=\"wp-caption-text\">The tank selection valves to switch between the two 300 liter water tanks.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>What a difference a day makes. Contrary to forecast the day was perfect for boat building and gluing in particular. I was still thinking of my friend Bruce who was retrieved intact from the briney last weekend and the importance of a good boarding ladder so I added a second 12 mm ply reinforcing panel [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/posts\/1184"}],"collection":[{"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1184"}],"version-history":[{"count":2,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/posts\/1184\/revisions"}],"predecessor-version":[{"id":1197,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=\/wp\/v2\/posts\/1184\/revisions\/1197"}],"wp:attachment":[{"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1184"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1184"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.gwiz.au\/passion_wp\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}